The AMETI Busway development is a complex infrastructure project for Auckland Transport which required accuracy and precision as well as live environment management.
Survey Group handled the setting-out and monitoring of construction, including bridges and structures. The project was located in a tight road corridor requiring a careful approach and management of staff to ensure their safety at all times.
Our Role
- Bridges and Structures Grid Set Out
- Station Grid Set Out
- Structures Monitoring
- Construction Monitoring
- Digital Engineering
- As Built Surveys
