Considered the foremost experts in rail surveying in New Zealand, Survey Group were called on to provide 24/7 surveying expertise to ensure the Auckland electrification project remained in line and on track.

The project demanded considerable resources during its 2 year development with real time live monitoring and 12 x 12 hour shifts during construction peaks.

Our Role

  • Pilons and Structures Grid Set Out
  • Station Grid Set Out
  • Structures Monitoring
  • Construction Monitoring
  • Digital Engineering
  • Digital Model Management
  • As Built Surveys
  • Live Environment Advisory
Our Projects: Auckland Rail Electrification