Considered the foremost experts in rail surveying in New Zealand, Survey Group were called on to provide 24/7 surveying expertise to ensure the Auckland electrification project remained in line and on track.
The project demanded considerable resources during its 2 year development with real time live monitoring and 12 x 12 hour shifts during construction peaks.
Our Role
- Pilons and Structures Grid Set Out
- Station Grid Set Out
- Structures Monitoring
- Construction Monitoring
- Digital Engineering
- Digital Model Management
- As Built Surveys
- Live Environment Advisory
