A 6-star luxury hotel, the Park Hyatt is a waterfront development that required extensive surveying of the shoreline to assist with excavation, pile set out, basement and building construction.

Survey Group was pivotal in providing expertise to guide construction and close out the project successfully, including a post-construction survey to assess with facilities management.

Our Role

  • Bridges and Structures Grid Set Out
  • Station Grid Set Out
  • Structures Monitoring
  • Construction Monitoring
  • Digital Engineering
  • As Built Surveys

Survey Group provided its extensive maritime expertise on the wharf extension making sure the pile and deck set out was accurate and easily understood by all.

“The project was rather tricky to set up and allocate the pile grid reference before the natural elements interfered with their reference and placement.”

With over 35 years expertise in maritime surveying Survey Group have the manpower and expertise to assist with the most complex projects on the foreshore.

Our Role

  • Pile Grid Set Out
  • Pile Monitoring
  • Construction Works
  • Wharf Deck Set Out
  • Digital Engineering
  • As Built Surveys